Arvox

Accredited Civil Defense office — Salamah platform

Arvox is accredited with Civil Defense via the Salamah platform — we prepare the technical reports, issue conformity certificates, and follow your file through to the permit.

Civil Defense licence via the Salamah platform
Civil Defense

Accredited Civil Defense office — Salamah licences

As an office accredited by the General Directorate of Civil Defense through the Salamah platform, Arvox holds both the establishment licence and the activity-practice licence — preparing immediate and non-immediate technical reports, issuing conformity certificates, and following safety requirements through to the facility's Civil Defense permit.

Need a Civil Defense permit for your facility? As an accredited Civil Defense office holding both the establishment and activity-practice licences, we run the file end to end: site inspection and occupancy classification, preparing and filing the immediate or non-immediate technical report on Salamah, then clearing observations until the permit is issued — without you ever touching the platform.

Arvox holds both the establishment licence and the activity-practice licence. The first covers the office as an entity, the second its right to practise the safety activity and issue approved documents. Holding both is what allows immediate and non-immediate technical reports to be prepared and conformity certificates issued in the office's name.

In practice the route begins with inspecting the facility and classifying it by occupancy type, then matching the existing protection systems against the requirements for that classification, then filing the report on the platform and working the observations until they are closed. What usually delays a permit is not the equipment — it is a wrong occupancy classification or missing commissioning and test documentation.

Immediate and non-immediate reports

Prepared and filed on the Salamah platform in the name of an accredited office.

Conformity certificates

Issued after on-site verification that the installed systems meet the requirements.

Occupancy classification

Classifying the facility correctly — the single most common cause of permit delay.

Follow-through to closure

Working Civil Defense observations through to permit issue, not just handing over a report.

How the file runs with us

  1. Inspection and occupancy classification

    We visit the facility and establish its activity, floor area and occupant load. That classification sets every requirement that follows.

  2. Checking the protection systems

    We check alarm, suppression, emergency exits and emergency lighting against the classification's requirements and identify any gaps.

  3. The technical report on Salamah

    An immediate report for some lower-risk activities, or a non-immediate one where deeper inspection is needed, filed in the office's name.

  4. The conformity certificate

    Issued once site verification confirms the installed systems meet the requirements.

  5. Closing observations through to the permit

    We resolve Civil Defense observations and follow them until the permit is issued.

What to prepare before we start

  • The commercial registration and facility documents, such as the building permit or lease.
  • Architectural drawings if available. If not, we survey the site ourselves.
  • Test and commissioning certificates for the existing safety systems, and their maintenance contract if there is one.
  • A description of the activity and the materials stored or used on site.

Check the accreditation yourself

Before engaging any office, ask for its Civil Defense licence number and check it through the Directorate General of Civil Defense's official channels.

Civil Defense official site ↗

Common questions

Can I file a Civil Defense report myself?

No. Reports are filed on Salamah through an accredited engineering office that holds the activity-practice licence and signs the document in its own name.

What usually delays a Civil Defense permit?

Most often an inaccurate occupancy classification, or missing system testing and commissioning documents — not missing equipment.

Do you cover existing facilities or only new ones?

Both. Existing facilities usually need a gap assessment and remediation before the report can be filed.

What is the difference between an immediate and a non-immediate report?

The immediate report applies to some lower-risk activities; the non-immediate one is required where the activity or area needs a deeper inspection of the systems. We confirm which applies once we know the facility's activity and size.

How long does a Civil Defense permit take?

It depends on the facility's classification and the state of its systems. A facility whose systems are ready moves quickly; one that needs remediation takes as long as that work. We give you a specific estimate after the first visit.

Do you serve facilities in Dammam, Khobar and Jubail?

Yes. Our office is in Dammam and we cover the whole Eastern Province, as well as the rest of the Kingdom.

About Civil Defense

Salamah is the official channel through which Civil Defense requirements for facilities are administered in the Kingdom. Technical reports cannot be filed and conformity certificates cannot be issued except through an engineering office accredited with the Directorate General of Civil Defense and registered on the platform. An owner cannot file their own case — they need an office holding the activity-practice licence.