Arvox

MODON-accredited consulting office

Arvox is a MODON-accredited consulting office — factory design, supervision and surveying inside the industrial cities, with drawings that enter review directly.

Consulting office accreditation from MODON
MODON — Saudi Authority for Industrial Cities

Accredited consulting office with MODON

Arvox holds a consulting-office accreditation from MODON covering factory design, supervision of industrial, residential and service buildings inside the industrial cities, and surveying works. For industrial-city clients this means an office already accredited to work with MODON's requirements directly.

If your project sits inside an industrial city, the first requirement is a MODON-accredited office. Arvox holds a current consulting-office qualification and handles industrial-city files in Dammam and across the Eastern Province: factory design to MODON requirements, construction supervision, and surveying — one office, one responsibility.

Arvox holds a consulting-office qualification from MODON covering factory design, supervision of industrial, residential and service buildings inside the industrial cities, and surveying works. Being qualified means the office is already listed with the authority, so its drawings enter the review queue directly rather than stalling on a check of the office's eligibility.

Projects inside the industrial cities typically combine structural and safety requirements in a single file: industrial activity classification, fire loads, separation distances, and protection systems appropriate to the materials being stored or processed. Holding both civil and safety engineering activities on the office licence is what allows the whole file to be handled without splitting it.

Factory design

Design that accounts for industrial activity classification, fire loads and separation distances.

Construction supervision

Industrial, residential and service buildings inside the industrial cities.

Surveying works

Included in the same qualification scope, with no separate contractor required.

Pre-listed office

Drawings enter review directly instead of stalling on an eligibility check.

How the file runs with us

  1. Reviewing the industrial city's requirements

    We start from MODON's requirements for that city: setbacks, separation distances and permitted uses.

  2. Activity classification and fire loads

    We establish the industrial activity classification and the fire loads of stored or processed materials.

  3. The designs as one file

    Site plan, structure and safety systems prepared by one office, so review comments do not bounce between two parties.

  4. MODON's technical review

    We submit the file and resolve observations until the drawings are approved.

  5. Supervision and surveying to handover

    Construction supervision and surveying under the same qualification.

What to prepare before we start

  • The land lease from MODON.
  • A description of the industrial activity, production capacity and the materials used and stored.
  • The commercial registration, and the industrial licence if issued.
  • A survey of the plot, which we carry out if one is not available.

Check the accreditation yourself

MODON publishes lists of the consulting offices it has qualified. Ask any office for its qualification certificate number and check it with MODON before signing.

MODON official site ↗

Common questions

Do industrial cities differ from municipal approval?

Yes. Inside the industrial cities MODON is the regulator, with its own requirements and an approval route separate from the municipality's.

What does Arvox's MODON qualification cover?

Factory design, supervision of industrial, residential and service buildings inside the industrial cities, and surveying works.

Do you cover Dammam industrial city projects?

Yes. Our office is in Dammam and most of our projects are in the Eastern Province; proximity shortens inspection and coordination cycles.

Do you work inside Dammam's industrial cities?

Yes. Our projects include Amiantit's industrial sites in Dammam 1st Industrial City.

Does your service cover warehouses inside industrial cities?

Yes, under the qualification for factory design and supervision of industrial and service buildings, with safety systems matched to what is stored.

What most often delays MODON drawing approval?

Usually an inaccurate activity classification, separation distances that do not meet the requirements, or the structural and safety files split between two offices so comments keep cycling.

About MODON — Saudi Authority for Industrial Cities

MODON — the Saudi Authority for Industrial Cities and Technology Zones — runs the Kingdom's industrial cities and sets its own construction and operating requirements inside them. A tenant in an industrial city does not deal with the municipality in the usual way, but with MODON as both landlord and regulator, with its own requirements manual and approval route.