Arvox

Accredited engineering office in Dammam

Our head office is in Dammam, in Al Najem Tower, Al Mazrouiyah. From here we follow Civil Defense, municipality and MODON files in person, and reach project sites across the city quickly.

Dammam puts very different facilities in one city: hospitals, schools and government buildings in the districts, showrooms and retail on the main roads, and factories and warehouses in the industrial cities and around King Abdulaziz Port. Each type carries its own classification and safety requirements.

Inside Dammam's industrial cities MODON is the regulator, with an approval route separate from the municipality's. Arvox is a MODON-qualified consulting office, and our industrial work in Dammam includes Amiantit's sites in the 1st Industrial City, the Zamil Steel factory, the Basic Chemical Industries plant and BAFCO's warehouses at King Abdulaziz Port.

Outside the industrial cities most files run on two tracks: the Civil Defense permit through Salamah, and Eastern Province municipality licences through Balady. We run both, so the owner does not shuttle between authorities.

Which authority covers your facility in Dammam

The first thing we establish on any file is where the facility sits, because that decides who approves the drawings and which route the file takes:

  • Inside the 1st, 2nd and 3rd Industrial Cities: MODON is the regulator, and the safety drawings are approved through a MODON-qualified office.
  • In the districts and on the commercial roads: municipality licences through Balady, and the Civil Defense permit through Salamah.
  • Facilities under HCIS directives: the Commission's requirements apply on top of the above.

Warehouses and workshops: the most common file

A warehouse is not one classification. What is stored and how it is stored decides the protection system, so the survey starts with these questions:

  • What is the stock, and does it include flammable or chemical materials?
  • How high is the storage, and is it racked or stacked on the floor?
  • Has a mezzanine or office been added inside since approval?
  • What separates the warehouse from the neighbouring units?
  • Are the existing water supply and pumps enough for what the current stock demands?

Before you sign the lease

Much licensing delay comes from a building that never suited the activity: a showroom turned into a restaurant, or a warehouse with no sprinkler network intended for high-hazard storage.

A short survey before signing shows what has to change and who pays for it, landlord or tenant, which is far easier to settle before the signature than after.

Common questions