Fire safety for hospitals and healthcare

In a hospital many occupants cannot evacuate themselves, so fire safety rests on protecting patients where they are and moving them horizontally between fire compartments.

Healthcare fire safety differs from other buildings in one basic way: full evacuation is not the first plan. The building is divided into fire compartments with rated walls and doors, so patients can be moved to an adjacent safe zone on the same floor, backed by early detection and suppression that buy staff time.

We have worked on Al-Zahraa, Al-Kahhal and Al-Rawdah General hospitals in Dammam, Gama Hospital in Dhahran and Hussein Al-Ali Medical Group in Al-Ahsa. In operating hospitals especially, we work around live services, scheduling inspections and alterations so departments keep running.

What the design has to get right

  • Fire compartments for horizontal evacuation
  • Early detection in patient rooms and corridors
  • Protecting medical gas areas, labs and kitchens
  • Evacuation plans for non-ambulant patients
  • Training staff for their role in the first minutes

The highest-risk areas in a hospital

Not every part of a hospital carries the same risk. Some combine a hazard with patients who cannot be moved at once, and these need specific treatment in the design:

  • Operating theatres and intensive care, where the patient stays put and is protected in place.
  • Medical gas stores and pipework, oxygen above all.
  • Laboratories and the pharmacy, with their flammable materials.
  • Kitchens and laundries.
  • Electrical rooms, generators and UPS systems.
  • MRI rooms, which need non-magnetic extinguishers and equipment.

Changing safety systems while the hospital runs

In a working hospital you cannot switch off the alarm or suppression in a whole department without a substitute. We phase the work department by department, and for each phase define temporary measures that cover the impaired system: a fire watch, extra extinguishing equipment, and a briefing so staff know what has changed.

We agree the schedule with hospital management and infection control, because ceiling and partition work in clinical areas has its own requirements.

When a healthcare facility should review its fire safety

Beyond new projects, these are the cases that call for a study or a review:

  • Extending the building or adding a department.
  • Changing the use of a wing, such as clinics to inpatient wards, because it changes the classification.
  • Renewing the Civil Defense permit.
  • Preparing for accreditation surveys that assess the facility's safety readiness.
  • Inspection observations that remain open.

Common questions

Yes. We schedule inspections and alterations department by department with the hospital's management so services continue.