Fire safety for malls and retail
A mall is one building that never stops changing: every new tenant alters fire loads and layout, and the systems have to stay compliant each time.
Malls combine peak-hour crowds, open volumes such as atriums and malls, and storerooms and kitchens behind the units. Design therefore starts from occupant load and exit capacity, then smoke control in the open volumes, then the sprinkler hazard class in storage areas.
We have worked on Cenomi malls across the Kingdom, Al Rashid Mall, LuLu Mall, Al Andalus Mall, and chains such as Carrefour, Hyper Panda, Othaim and Jarir. That volume has taught us that most problems appear at tenant fit-out, not in the original design.
What the design has to get right
- Occupant load and exit capacity at peak times
- Smoke control in atriums and malls
- Sprinkler hazard class for storage areas
- Tying unit alarms into the central system
- Reviewing tenant fit-outs before work starts
Tenant fit-outs: where the problems start
A mall is approved once, but its units change every year. Each new fit-out can touch a shared system without the contractor noticing. What we find most often:
- Ceilings and décor that obstruct sprinklers or shift their positions.
- A storage mezzanine inside the unit with no protection beneath it.
- A new activity that raises the fire load beyond what the unit was designed for.
- A restaurant kitchen with no hood suppression, or one not interlocked with the gas shut-off.
- Unit detectors not connected to the mall's alarm panel.
- Openings in separating walls left without fire-stopping.
Smoke control in atriums and malls
In a volume open across several floors, smoke spreads faster than the fire itself and reaches floors the fire has not touched. The smoke control system holds the smoke layer above head height long enough for shoppers to get out.
It is designed by calculation, not by rule of thumb, tied to the alarm so it runs automatically, and tested at handover and periodically afterwards. Any change in the atrium, from kiosks to hanging signage or ceilings, calls for a review.
When a mall or a unit needs a study
The cases we are most often called in for:
- A new mall, before drawing approval.
- A new unit, or a change of activity such as a shop becoming a restaurant.
- Extending the mall or re-dividing its space.
- Temporary events and kiosks in the concourses.
- Renewing the Civil Defense permit or closing inspection observations.
Our projects in this sector
Related services
Common questions
Yes. We review each unit's fit-out against the mall's existing systems and follow it through approval, so one fit-out does not break the whole building's compliance.